Prepping Your BIM Model for Construction Scheduling and Logistics
Watch this free screencast, hosted by Autodesk Technical Marketing Manager, Anthony Governanti, and see how to modify your model in the Revit format and prepare it for the construction process.
You'll learn how to schedule with the Navisworks timeliner, create construction parts from existing model elements, and organize the model by construction phase or zone using the Revit section box and Navisworks selection sets.




Subscribe
Great post on the videos. I've made them a requirement for my class.
Posted by: Kevin | March 15, 2012 at 05:52 AM
I checked the url but i didnot find any video there. please add more information about Construction Scheduling and Logistics.
Posted by: Portable Buildings | March 27, 2012 at 11:52 PM